Showing posts with label CRMHS. Show all posts
Showing posts with label CRMHS. Show all posts

Sunday, February 9, 2020

Project Segway - Central Model Train Show Day 2

Well Day 2 is in the books and the 2020 Central Model Train Show is over. The Central T-gauge Layout received numerous compliments, and a lot of stares in amazement.

The new bridge with the mirror.
I remembered to get a good shot of the bridge with the mirror I added. The effect is pretty good, and will be better once the backdrop supports it better.

We figure we ran about 1500 scale miles (m,ore than 3 real miles) during the show with very few problems. Most of that was with one engine. However, I did get out my Class 67, along with a couple of coal cars to pull a freight late in the day. I need to get some more coal cars. once I added the weights to the cars, the train ran well.

The short little freight goes by the station.
I have some thoughts about relocating a few buildings, and I have one more bridge to add to the line to the left of the water tank in the view above. This will also mean that I will cut into the cliff here and add a waterfall. Waterfalls always draw attention. There are a few bits of road that will need some work, and some sculptamold is needed by the bridges. However, it was a good show for the layout. I plan to upload a new video in a few days too.

I also have another T-gauge building project completed - and if it comes out okay from Shapeways, I hope to have a new addition to the layout - or to the next layout. We will see. I have anumber of things to work on for next year, including further work on the town, adding driveways, mounting the buildings in their final positions, the station platform, the new bridge, a bit of scultamold work, ground cover, water, trees, bushes, etc, and vehicles. Lots to do, and other projects on my mind as well.

Cameron Turner

Saturday, February 8, 2020

Project Segway - Central Model Train Show Day 1

Day 1 is in the books. It was an adventure getting to the show yesterday morning - more on that next week - but the layout made its appearance.

Central T-Gauge Layout 2020.
The painted buildings make a big difference, and the road and adjoining sidewalks are in place. The layout ran fairly well, with periodic cleanings necessary. Many folks were impressed with the layout and the fact that it is in something even smaller than Z-scale.

If you are in the upstate tomorrow - come by Easley between 10AM and 5PM. There are lots of vendors, layouts and of course - the mini T-gauge layout to see.

Cameron Turner

Friday, August 9, 2019

An Ops Moment

On Thursday night this week I took a break from layout work to attend the August Operations Night at the Central Railway Model and Historical Society Layout in Central, SC. They have a large double deck HO scale layout that runs through an old house in Central (open to the public 9-2 on Saturdays). Because it is a club layout open tot he public, the layout is designed as a large loop, and so operations must fit within the display parameters of the layout. Therefore, the club has developed a set of scenario cards that define jobs. These jobs typical become like for like replacement operations, but they do mean that cars do systematically move around the layout over time so that the layout is not entirely static.

The Crescent Approaches.
The layout is based on the operations around the town of Central in the late 1950s. My job last night was operations around a large paper mill complex off the mainline. The job was enjoyable, but the layout was not its most cooperative. Electrical gremlins were afoot. I even learned that there is a combination of switches that you can throw in the paper mill that leads to a short that will shut down the layout. Of course, I did just that.

The first paper mill switcher sidelined due to electrical gremlins.

The Paper Yard.

The replacement switcher.
The complex is very neatly detailed, and posed a solid challenge to operate. Gremlins are never fun, but part of the hobby some nights. It did remind me that I want to make sure I do not have any long reaches to turnouts - a couple in the paper mill exceeded 36". But even a single major industry can provide an interesting evening of switching.

Cameron Turner


Saturday, June 22, 2019

Three months ago – I could have died…


It has been a while, more than three months actually since the last and in fact the only post so far in 2019. And so, there is a little bit of a need for a reboot on this blog, something I was thinking about as early as last spring, before things happened.

My last post was about the T-scale (1:450) layout I have been slowly building for the Central Model Railway and Historical Society Club and its second public show. About the time of the last post, I was planning how to get it ready for its third show last April. I missed the warning signals for a derail.

I had been seeing a doctor for being tired – nothing unusual there for those who know me. It is not like I have been known to not only burn the candle at both ends, but to also light it in the middle for good measure. But even for me I was tired. Four months of testing had suggested that I had some significant allergies. But we ran one more test. And that one came up with a result that sent me to a specialist. The specialist suggested another more definitive test, indicating that this was likely a false positive, maybe something relatively minor, but admitting that it could be more serious. So, a couple of weeks later, we ran the next test in the hospital.

It was supposed to take about an hour, and my wife settled down to wait for the results. Fifteen minutes later, the doctor was out, and simply said, “He needs surgery and we want a particular team of doctors to do the surgery, but they cannot do it until next Friday, so we are keeping him overnight to see if he can wait that long.”

A week later, I was checked into the hospital for open heart surgery. I hadn’t had a heart attack, but I was on my way to one, and it would have been a big one. The surgery led to a triple bypass, from which I have been recovering for the last three months.

While recovering, I have had a lot of time to think and to look at my priorities. I love model railroading, but it has always been something that has been something that I would immerse myself in later in my life. After this experience, I no longer am willing to wait for the perfect space, for the rest of my life to fall into place, or to let current uncertainties prevent me from enjoying my hobby. I want to do more than the limited things I have done for other clubs or projects. I want to build parts of my own railroad empire, even if those visions may not come to fruition as planned. Finally, I also recognize that model railroading is a major stress reliever for me, and that I need to prioritize that more in my life going forward as I recover from surgery.

So, what does this mean for the blog? Well, I hope that it means a new life for it. I plan on revamping it a bit. I am going to shift some of the posts on the T-layout to a separate blog for the club, and I am going to continue that layout. I am going to continue a number of the projects I started last year and to pursue my Master Model Railroader certificate with the NMRA. But I am also going to try to publish more regularly on this blog, and in other venues about my planned railroad. Three months of recovery has given me some time to think about and plan a layout. So, that is where I will begin the story, with the development of the plan. 

I don’t know if it is what I will build, or when it might be complete. But I have decided that there are plenty of tasks I can start doing to build parts of it. And rather than waiting to know that the final product can be built as I plan on building it, I am going to simply imagine the final product, and build while I await the other parts necessary for the layout to fall into place. In the meantime, I will enjoy the journey. So, all aboard for the journey. We are going Thru the Rockies…Not Around Them In 1:160.

All Aboard!

Cameron Turner