Wednesday, March 4, 2020

Wordless Wednesday

A trio of Citirail engines is leading an Eastbound over the Moffat. Not only are these engines unusual, but the 2 DPUs exiting Tunnel 1 (upper right) are a CSX and BNSF unit. Photo by John Shine. February 17, 2017.

Cameron Turner

Wednesday, November 27, 2019

Wordless Wednesday

Southern Pacific uses a trio of BN SD60Ms, led by BN9259 to lead a coal train east towards Blue Mountain Drive in August 1993.  Note the pair of DRGW Tunnel Motors as swing helpers in the background. Photo by John Shine.





3 Days, 3 Posts to Go.

Cameron Turner

Wednesday, November 13, 2019

Wordless Wednesday

July 2014, a westbound BNSF train with a BNSF warbonnet, a CSX and a former Soo engine head past Blue Mountain crossing. Photo by John Shine.

17 Days to go. 17 Posts to go!

Cameron Turner

Thursday, November 7, 2019

The Turning Point – Part 6: Coal Creek Canyon Revised

The major purpose of the climb from Rocky Siding, through the Big 10 curves, continuing through Clay siding and into Coal Creek Canyon is to transition from the first deck to the second deck of the layout. The question becomes as to whether there is sufficient elevation gain to make this feasible. Concern about the tight vertical clearances and the resulting physical viewability/operability of that section of the layout is at question. Improving the configuration is the necessary goal of this revision to the layout. The original Coal Creek Canyon section of the layout looked like this.

Original Coal Creek Canyon Track Plan.
In the original track plan, there was about 6" between the siding level and the bottom of the upper deck. By the time we get into the turnback loop in Coal Creek Canyon, the bottom of the upper deck is at about 15.5", and the Rocky Flats Branch would be at about 10", providing a gap of 5.5". This is workable, but tight. The space to the mainline is a little better, resulting in a gap of about 11", which is much better.

Revised Track Plan for Coal Creek Canyon.
The revised plan does a little better, but not much. The separation between Rocky Siding and the lower deck is still about 6". but rapidly increases. The Rocky Flats Branch would now be 6" below the bottom of the upper deck with Coal Creek Canyon above. However, the main line is now nearly 13" below the bottom of the benchwork by the time the mainline reaches Tunnel 1. The big difference in the plans is that the grade climbs more from C&S Junction, all the way to Rocky. The grades through the LDEs max out at about 2.2%, and the mainline tends to lie towards the front of the benchwork in the tightest areas. By the Coal Creek Canyon turnback curve, the main line has more than 8" of clearance to the bottom of the upper deck.

I would still like to do better, but as it was before, this is acceptable. With the other improvements to the flow of the layout, the new configuration is definitively better than the original configuration. Other than a slight elevation change, the layout continues through Tunnel 1 as previously designed. The next change comes with Plain siding, which has now been relocated to head towards the bottom of the room. So, we will continue examining the line as we head towards Plain.

23 Days to Go. 23 Posts Remaining.

Cameron Turner