Showing posts with label East Portal. Show all posts
Showing posts with label East Portal. Show all posts

Wednesday, July 22, 2020

Wednesday, July 15, 2020

Wordless Wednesday

Looking West, a UP train begins to roll downgrade through East Portal. Photo by Mike Danneman.
Cameron Turner

Wednesday, May 13, 2020

Wordless Wednesday

A UP Eastbound exits the East Portal of the Moffat Tunnel in 2001. Photo by Kyle Yunker.
Cameron Turner

Wednesday, May 6, 2020

Wednesday, December 11, 2019

Wordless Wednesday

East Siding Switch of East Portal Siding, October 5, 2019. BNSF 5042 heads east towards Denver. Photo by Joe McMillian.



Cameron Turner

Monday, December 9, 2019

Deck 3 Overview - Tunnel 23 to East Portal

Before continuing past the Moffat Tunnel, let's review the third deck to put these pieces into relative context with each other.

Deck 3 Plan - Garage Side.
The second deck ended with the passages through Tunnels 19-22 after the siding at Crescent. This trackage is shown in a light grey as the visible track for a lower deck in the drawing above. I started modeling the third deck at Tunnel 23, and proceeded through Tunnels 24-27 and ending with Tunnel 29 and the Bridge at MP 36.45 before entering Pinecliffe. Pinecliffe is about 8 scale miles by track from Rocky siding where the climb began in earnest. Trains continue through Pinecliffe, the neighborhood around Pactolus, through Rollins Canyon and Tunnel 30 before reaching Rollinsville. Leaving Rollinsville, the trains pass through Espy, where I have incorporated a hidden loop to further lengthen the run, into Tolland Canyon and to the siding at Tolland. Departing Tolland on the opposite side of the aisle from Crescent, the trains enter Mammouth Gulch, where scenery will screen their transit through the doorway back into the basement while operators navigate under the nod under formed by the east end of Crescent siding.

Deck 3 Plan - Basement Side.
Re-entering the basement for the first time since leaving North Yard, trains run through a hidden loop at Mammouth Gulch to add distance between Tolland and East Portal before coming back into view and crossing the Mammouth Gulch bridge. Trains proceed into East Portal and the Moffat Tunnel under the continental divide at James Peak. While East Portal is directly above North Yard, I think the wider aisle at North Yard and the lack of significant work at East Portal will prevent the need for crews to congregate in the aisle. Furthermore, the North Yard switch crews will likely be seated to do their work, while the trains at East Portal are nearly 4 feet over the yard.  The end of Deck 3 is marked by the Moffat Tunnel, whose 6.2 mile length is modeled by a 1.6 mile run through a helix that allows the train to exit West Portal into Winter Park at an elevation only 4 inches below that of East Portal.

One legitimate option here is for me to end the layout here. I could ignore Winter Park and the western slope altogether and simply run the Moffat Tunnel down the back side of the backdrop (above Rennick Yard) and into the helix to get to staging. But, as I have mentioned before, I do want to simulate the Ski Train operations, and at a minimum, that means including the stop for the Ski Train at Winter Park. So that is our next stop as we go Through the Rockies...Not Around Them in 1:160.

Cameron Turner


Thursday, December 5, 2019

East Portal

The last siding on the east side of the climb to the Moffat Tunnel lies just east of the eastern portal and is called East Portal. The siding is 5750 feet long, slightly longer than Tolland. One of the primary purposes of the siding is to queue trains waiting for the tunnel to ventilate. The 6.2 mile long Moffat Tunnel was built between 1924 and 1928 and also includes a second bore used to bring water from the western slope to the eastern slope. This water is fed into South Boulder Creek at the tunnel.

East bound DRGW train exiting the East Portal of the Moffat Tunnel. Photo from ClassicStreamliners.com.
I was able to use a combination of satellite images of the East Portal complex, and a set of plans published in the 1980s to create a scale plan of the site and the different structures. Based on the space available (the area above North Yard) I did need to consolidate the structures a little bit, but the buildings are full size. As a signature element of the layout, I want this facility to be an accurate model of the real location.

I recently found a video of a drone at the Moffat Tunnel which also gives some additional views and details.


With such a long tunnel, ventilation is a necessary consideration, particularly with the summit inside the tunnel. Both east bound and west bound trains have to climb while in the tunnel, and as can be seen by how dirty engines got on the Moffat Line, a ventilation system had to be installed in the tunnel. The door opens when an east bound train gets within 1500 feet of the tunnel portal and closes after the train departs the tunnel. The tunnel doors also close about 40 seconds after a westbound train finishes entering the tunnel. The fans ventilate the tunnel for approximately 20-25 minutes after the portal closes. It takes a train approximately 9 minutes 30 seconds to traverse the tunnel. The doors seem to take 10-20 seconds to close. I plan to model the operation of the door.

DRGW freight train entering the Moffat Tunnel. Photo by Jim Carr.

Helpers entering the East Portal. Photo by Jim Carr.

The Tunnel is not the only thing at East Portal. There is a wye that used to lead to the line over Rollins pass, and a number of structures, including a two stall metal train shed. I am not exactly sure what the purpose of the train shed is, but suspect that it is used to store tunnel maintenance and snow equipment.

View at East Portal looking east. The train shed and a storage shed are to the left of the engine. Photo by Jim Carr.
I tried to capture most of these features in the track plan for East Portal. The siding is 111 inches long, a little longer than Tolland.

East Portal Track Plan.
In addition to the siding, I have included the wye, bringing the third leg of the wye out over the aisle for North Yard. This should work for most operators, as the benchwork should be approximately 77" above the floor, so most people will walk right under the wye. Given the elevation, I tried to keep the track accessible, and to the front of the benchwork. However, it will take a step stool to work East Portal. I've been able to include many of the structures, including the tunnel and the associated ventilation system. As the main line enters the tunnel, like the prototype, it begins to climb.

Cameron Turner